Sun Spree Lightning Rods (863) 618-7146

New construction

New construction lightning protection systems

The cleanest, most complete lightning protection goes in while the building goes up. We work with builders and owners to plan the system, install it at the right stage, and leave nothing showing that does not need to.

During construction we can run conductors under the roofing, inside walls and through chases, and place grounding before the landscaping goes in. That means fewer visible parts, cleaner roof lines and a system laid out for the building from day one.

We design and install new construction lightning systems for new homes, commercial buildings and agricultural structures throughout Florida, to UL 96A and NFPA 780.

A copper air terminal on its base plate with a copper conductor cable running up the ridge of a roof during dry-in
Copper air terminal and conductor on a roof during dry-in, before tile goes on.

How we work with builders

  • We review the plans and lay out air terminals, conductors and grounding
  • Rough-in happens at the dry-in stage, before roofing goes on
  • Air terminals are set and flashed with the finished roof
  • Grounding goes in before final grading and landscaping
  • A final inspection confirms the system before you move in

Copper or aluminum, exposed or hidden

New construction is the best time to hide the system inside the building. We help you weigh copper against aluminum and exposed against hidden conductors, then build the whole system to match.

How it goes

From estimate to inspection

  1. Plan reviewWe lay the system out from your plans and give a free estimate.
  2. Rough-inConductors go in at dry-in, under roofing and inside walls.
  3. Trim outAir terminals are set on the finished roof.
  4. InspectEvery connection is checked before the job is handed over.

Want nothing showing on the finished roof? Ask about concealed lightning protection. Already built? Lightning rod installation adds a complete system to a finished home, and our repair and inspection service checks one after a re-roof.

Questions

New Construction Lightning Systems FAQ

When should a builder call about lightning protection?

Before the roof goes on. Planning during framing lets us hide the conductors and coordinate with the roofer.

Can lightning protection be added to plans already under construction?

Usually, yes. The earlier we see the building, the more of the system can be hidden.

Free estimate

Tell us what needs protecting

Send the form or call (863) 618-7146. Michael Riley and the team will look at the job and give you a free estimate.

  • Designed and installed to UL 96A and NFPA 780
  • Copper or aluminum systems
  • Inspected when the job is done

Get a free estimate

Rather talk? Call (863) 618-7146. Open 7 days, 9 AM to 5 PM.